Adding HaynesPro Work to a Document

Adding HaynesPro Work to a Document

Three HaynesPro sections let you send work straight to the document: Repair Times, Schedules and Timing Belt/Chain. The labour hours and the parts each job needs are added together, grouped by the part they belong to.
Every time is shown twice. The figure in brackets is the HaynesPro book time and the bold figure is what you will charge, after your labour uplift has been applied. It is the bold figure that reaches the document.

Adding repair times

    Open the document, choose the Lookup tab and select HaynesPro Technical Data .
    Choose the Repair Times tab. If the wrong vehicle has been matched, choose Change vehicle first.
    Choose a category, then a sub-category. For a front brake job you would choose Brakes (Mechanical).
    Then Brake Pad.
    Tick every job you want. A running total appears at the foot of the list, for example 0.70 h total.
    Check the Parts Needed panel to see what the selected jobs will bring with them.
    Choose Add Lines to Document.
    ,A green text confirmation appears at the top and the list clears, ready for the next selection.

Finding an operation by searching

If you know what you are looking for, searching is quicker than working down through the categories.
    On the Repair Times tab, type into the search box, for example brake pads .
    Choose Search .
    Tick the operations you want and choose Add Lines to Document , the same as you would from a category list.
Each result shows its category path underneath it, so you can see where the operation sits. Choose Back to categories to return to the full list.
[Screenshot: Repair Times search results showing the category path under each operation]

Adding a service schedule

    Choose the Schedules tab and select the schedule that suits the vehicle's mileage, for example Every 140,000 miles.
    Read the three figures in the header. Standard Time is the schedule itself, Extra Time is anything you add on top, and Total Time is the two together.
    Tick any parts you want under the parts list.
    Tick anything under Additional work or any item marked Follow Up that you want to include. The header total updates as you tick.
    Choose Add Lines to Document.


Adding timing belt or chain work

    Choose the Timing Belt/Chain tab.
    Read the replacement interval and the procedure. The sidebar splits it into warnings and recommendations, general information, removal, installation and torque settings.
    Tick the work you want and choose Add Lines to Document.

How the lines arrive on the jobsheet

Lines are grouped by the part they belong to. A brake job comes through as a Brake pad group and a Brake disc group, each holding its own labour and parts.


See Also




Globe with Meridians English (UK, IE, IM and IZ). To find documentation in other regions where Garage Hive operates, click  here.